Point Motor & Control Panel Switch Installation – Part 1
In this 1st part Jason explain how the control panel was constructed, show how the (On – Off – On) momentary switches are fitted into the control panel and show how they are then wired up. N.B. This setup is his way on how to simply operate insulfrog points.
Look out for Part 2 coming soon, showing point motor installation, wiring them up and then connecting to the control panel for operation.
Trackbacks/Pingbacks